Accession Number:

ADA238452

Title:

Monitoring Well Installation and Groundwater Sampling and Analysis Plan at the USARC Training Reserve, 84th Division, Milwaukee, Wisconsin

Descriptive Note:

Corporate Author:

DONOHUE AND ASSOCIATES INC SHEBOYGAN WI

Personal Author(s):

Report Date:

1988-11-01

Pagination or Media Count:

105.0

Abstract:

Objectives of this work plan are to ensure that monitoring well construction and groundwater sampling and sample custody procedures employed at the 84th U.S. Army Reserves Training Center are consistent with Donohues standard guideline and specifications prior to the initiation of onsite activities. This plan will Document sample frequency, depth, and the geotechnical testing requirements required to properly evaluate site geology Describe procedures for monitoring well installation and development Describe the equipment and sampling methods that will be used to obtain groundwater and soil samples Describe precautions to be taken during collection of groundwater samples which will minimize potential contamination Outline procedures for documentation of field activities and Describe the methodology employed for sample labeling, packaging, storage, shipping, and chain-of-custody procedures. Four groundwater monitoring wells will be installed at two location. Each well nest will be comprised of one 20-foot observation well and one 45-foot piezometer. Following development of each newly-installed well, twelve new and existing wells will be sampled to determine groundwater quality.

Subject Categories:

  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE