Technology Insertion-Engineering Services Process Characterization. Technology Insertion (TI)/Industrial Process Improvement (IPI) Task Order Number 1. OC-ALC/MATPCC, Electromechanical Unit

Descriptive Note:

Data Base Documentation Book, Summary rept. Aug 1988-Aug 1989

Corporate Author:

MCDONNELL DOUGLAS MISSILE SYSTEMS CO ST LOUIS MO

Personal Author(s):

Report Date:

1989-09-11

Pagination or Media Count:

237.0

Abstract:

The layout drawings do not reflect the current layout of MATPAC. The layout will be changed again in three months as the RCC restructures its organization to accept additional personnel and KC-135 cable workload. Up-to-date drawings were not provided to MDMSC. The layouts provided by the ALC are included in the Database Documentation Book. MATPCCs equipment consists primarily of test stands and other testing instruments. Most of them have been in use for 15 to 25 years, but they are still reliable. The first MATPCC test stands in Building 3108 used to test fuel flow transmitters are scheduled for replacement by two new test stands. The operator stated that the new equipment will be safer and more efficient. Readouts will be digital, eliminating judgement calls by operators reading analog gages. It will be simpler to install the parts on the test stands and to adapt the test stands to the different part configurations. Additional safety features will be included as well. The painting, sandblasting, and magnetic particlefluorescent penetrant processes are conducted as back shop operations outside of MATPCC. A listing of equipment for MATPCC can be found in the Data Collection section of the book.

Subject Categories:

  • Manufacturing and Industrial Engineering and Control of Production Systems

Distribution Statement:

APPROVED FOR PUBLIC RELEASE