Accession Number:

ADA234487

Title:

Remedial Investigation Concept Plan for Picatinny Arsenal. Volume 1. Environmental Setting, Applicable Regulations, Summaries of Site Sampling Plans, Sampling Priorities, and Supporting Appendixes

Descriptive Note:

Final rept.

Corporate Author:

ARGONNE NATIONAL LAB IL ENVIRONMENTAL ASSESSMENT AND INFORMATION SCIENCES DIV

Report Date:

1991-03-22

Pagination or Media Count:

310.0

Abstract:

Volume 1 of this report contains descriptions of the study area and state and federal regulations, brief descriptions of areas and sites being investigated and the process by which they were chosen, summaries of the proposed RI sampling plans, and a priority ranking of the areas also included are summaries of munitions loading production and chemicals and radioactive materials usage at PTA. For each site, a brief description of the history, geology, and hydrology is followed by a discussion of the available data and information pertaining to the existing contamination. Based on the existing data, a remedial investigation RI action plan is proposed for each site. Each action plan describes additional data needed to adequately characterize and monitor existing and potential contamination at the site.

Subject Categories:

  • Civil Engineering
  • Logistics, Military Facilities and Supplies
  • Solid Wastes and Pollution and Control
  • Water Pollution and Control
  • Pesticides Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE