Accession Number:

ADA218985

Title:

Enhanced Preliminary Assessment. Task Order 2. Nike Battery Kansas City 30, Pleasant Hill, Missouri

Descriptive Note:

Final rept.

Corporate Author:

WESTON (ROY F) INC WEST CHESTER PA

Report Date:

1989-12-01

Pagination or Media Count:

135.0

Abstract:

An enhanced preliminary assessment was conducted at the Nike Battery Kansas City 30 Nike KC-30 site under the Base Closure Program. The property was used as a Nike missile battery installation from 1958 until the late 1960s when the Nike-Hercules mission was discontinued. From 1969 to 1988 the site was occupied by the Missouri National Guard. Currently the site is unoccupied. Based on information obtained during the onsite visit and from available drawings and reports, twenty environmentally significant operations ESOs have been identified. No immediate action is required at any location. For twelve ESOs, site investigations are recommended. These include asbestos and air sampling in the various buildings leak testing underground storage tanks sampling transformer oil and soil, sediment and groundwater sampling at various locations. Keywords Launching sites Army facilities Base closure program Environmentally significant operations.

Subject Categories:

  • Guided Missile Launching and Basing Support
  • Environmental Health and Safety

Distribution Statement:

APPROVED FOR PUBLIC RELEASE