Abstract:

Compliance testing for particulate and visible emissions was conducted on coal-fired boiler No. 3 in the Eielson AFB Central Heat and Power Plant on 12-22 July 88. The survey was conducted as a requirement for renewal of Alaska Department of Environmental conservation Air Quality Control permit to operate 8331-AA001. Boiler No. 3 was tested at capacities of 100,000 lbs steam hr and 90,000 lbs streamhr. Results indicate that boiler No. 3 passed the visible emissions standard, but failed the particulate emission standard. Keywords Air pollution, Emission control, Smoke stacks, Sampling.

Subject Categories:

  • Air Conditioning, Heating, Lighting and Ventilating

Distribution Statement:

APPROVED FOR PUBLIC RELEASE