Title:

New Bedford Harbor Superfund Project, Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. Report 1. Study Overview

Descriptive Note:

Technical rept. Aug 1985-Mar 1988

Corporate Author:

ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG MS ENVIRONMENTAL LAB

Report Date:

1988-10-01

Pagination or Media Count:

35.0

Abstract:

Sediments in the New Bedford Harbor and Acushnet River Estuary have been contaminated with polychlorinated biphenyl compounds and heavy metals. The high levels of contamination have resulted in the New Bedford Harbor being placed on the National Priorities List of the Nations worst hazardous waste sites. Efforts are under way to develop and implement remedial actions for protection of the environment under the Federal Superfund Program. This report is an introduction to and an overview of a series of reports describing the results of the EFS. It presents the overall study objectives and scope of work, describes the objectives and scope of the 10 EFS tasks, and presents a brief synopsis of the other 11 reports in the series. The EFS technical approach used field data collection activities, literature reviews, laboratory bench-scale studies, and analytical and numerical modeling techniques to assess engineering feasibility and develop conceptual alternatives for dredging and dredged material disposal. Technical and engineering issues addressed by the EFS included baseline mapping, geotechnical investigations, hydrodynamics, sediment resuspension and transport, contaminant releases to surface and ground water, dredged material settling properties, dredging equipment and controls, effluent treatment, solidificationstabilization of dredged material, confined disposal facility design, contained aquatic disposal facility design, and cost estimates for the alternatives evaluated.

Subject Categories:

  • Solid Wastes and Pollution and Control
  • Water Pollution and Control