Accession Number:

ADA199090

Title:

Gap Crossing Requirement

Descriptive Note:

Rept. for Oct-Dec 1987

Corporate Author:

ARMY TRADOC ANALYSIS COMMAND FORT MONROE VA REQUIREMENTS AND PROGRAMS DIRECTORATE

Personal Author(s):

Report Date:

1988-08-01

Pagination or Media Count:

16.0

Abstract:

The Gap Crossing Requirement Review was performed in response to a question on whether the BFV follow-on should be required to swim. The purpose of the study was to conduct an analysis of the European geographic factors which force or allow the Army to seek a swim capability for future infantry fighting vehicles. The analysis is based on data from a Waterways Experiment Station WES report, The Evaluation of the M2 Bradley Fighting Vehicle BFV System Crossing Gaps in Selected Areas in the Federal Republic of Germany, the Armored Family of Vehicles draft Required Operational Capabilities ROC document, and telephonic input from British and German analysts. The assessment compares geographic information with vehicle limitations. Keywords Bradley fighting vehicle Mobility Swimming Ford River crossing Gap crossing.

Subject Categories:

  • Combat Vehicles

Distribution Statement:

APPROVED FOR PUBLIC RELEASE