Accession Number:

ADA195220

Title:

Compliance Testing of Grissom AFB Central Heating Plant Coal-Fired Boilers 3 and 4, Grissom AFB Indiana.

Descriptive Note:

Final rept. 18-23 Nov 87,

Corporate Author:

AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL HEALTH LAB BROOKS AFB TX

Personal Author(s):

Report Date:

1988-03-01

Pagination or Media Count:

151.0

Abstract:

At the request of HQ SACSGPB, compliance testing particulate emissions of coal-fired boilers 3 and 4 in the Grissom AFB central heating plant was performed on 18-23 Nov 1987. The survey was conducted to determine compliance with Indiana Administrative Code, Title 325--Air Pollution Control Board, Articles 5 and 6. Results indicate Boiler 3 met particulate standards while exhausting through the bypass stack, but failed to meet standards when exhausting through the scrubber stack. Boiler 4 met particulate standards when exhausting through both the bypass the scrubber stacks. Keywords Compliance testing Stack sampling Stack emissions Grissom Particulates Garrison Source emission testing Boiler Air pollution.

Subject Categories:

  • Air Conditioning, Heating, Lighting and Ventilating
  • Air Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE