DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADA172149
Title:
GTWT Flow-through Anechoic Chamber Design.
Descriptive Note:
Technical memo.,
Corporate Author:
PENNSYLVANIA STATE UNIV UNIVERSITY PARK APPLIED RESEARCH LAB
Report Date:
1986-07-18
Pagination or Media Count:
34.0
Abstract:
Preliminary cost figures are presented to provide estimates of the funding required to complete the flow through anechoic chamber at the Garfield Thomas Water Tunnel. Information necessary to obtain these estimates required major decisions on the philosophy of design and operation of the chamber. Plenum wall details were discussed with the scientist who performed tests of a 16 scale model of the chamber for his Masters degree in architectural engineering. This report describes the construction details and turbulence control measures that resulted from these discussions. The total cost to complete the anechoic chamber test facility is estimated to be approximately 330K. This figure does not include cost of instrumentation or signal processing equipment. Appendix A describes the design of a simple adjustable wedge mechanism. Appendix B contains a survey of existing air flow anechoic chambers. Appendix C includes copies of reports of flammability of anechoic wedge materials.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE