Underwater Facilities Inspections and Assessments at Refit Piers 1 & 2 Trident Refit Facility, Bangor, Washington.

Descriptive Note:

Corporate Author:

MITRE CORP MCLEAN VA JASON PROGRAM OFFICE

Personal Author(s):

Report Date:

1981-06-01

Pagination or Media Count:

126.0

Abstract:

The major objective of the underwater facility assessments was to assess the general underwater structural condition of Refit Piers 1 and 2. Also, for the use in the long range foster facility study, data was recorded describing potentially deleterious conditions affecting the structure such as marine biofouling, corrosion, deficiencies in coatings, grouting, and cathodic protection, etc. This data will enable comparisons to be made in subsequent periodic inspections so as to determine progressive deterioration with time. Refit 1 and Refit 2 and the approach trestle were inspected in this survey. Critical conditions discovered during the survey were documented by photographs. In addition, photographs representative of marine growth on both concrete and steel piles were secured.

Subject Categories:

  • Civil Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE