Abstract:

During the period 3 through 13 May 1983, a CHESNAVFACENGCOM Engineer-in-Charge and divers from Underwater Construction Team Two UCT TWO conducted an inspection of the 42 fleet moorings operated and maintained by PWC Pearl Harbor. Eighteen of the moorings were found to be in good condition, three should not be used due to major discrepancies, and twenty-one were found to be in satisfactory condition for continued use within the constraints of their load capacities. Keywords Mooring inspection, Underwater inspection, Fleet moorings.

Subject Categories:

  • Civil Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE