Accession Number:

ADA156571

Title:

National Program for Inspection of Non-Federal Dams. Union Lake Dam (NH 00232), State Number 15.02, Piscataqua River Basin, Barrington, New Hampshire. Phase I Inspection Report.

Descriptive Note:

Corporate Author:

CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV

Personal Author(s):

Report Date:

1978-08-01

Pagination or Media Count:

94.0

Abstract:

The dam is 17 ft. high and 433 ft. long. It is an earth embankment placed between vertical dry masonry walls. The dam is in poor condition with a few major concerns. A major breach at maximum pool would probably result in the loss of less than 10 lives and appreciable property. Author

Subject Categories:

  • Civil Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE