Accession Number:

ADA156367

Title:

National Program for Inspection of Non-Federal Dams. Rocky Lake Dams (ME 00399) Orange River Basin, Whiting, Maine. Phase I Inspection Report.

Descriptive Note:

Corporate Author:

CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV

Personal Author(s):

Report Date:

1979-03-01

Pagination or Media Count:

88.0

Abstract:

The dams consist of two stone filled timber crib structures located about 400 ft. apart. The dams are assessed to be in poor condition. Because the southerly dam has been breached, it poses no threat to life or property downstream. It is intermediate in size with a hazard potential of low. Author

Subject Categories:

  • Civil Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE