Accession Number:

ADA156017

Title:

National Program for Inspection of Non-Federal Dams. Windsor Upper Dam (VT 00013), Connecticut River Basin, Windsor, Connecticut. Phase I Inspection Report.

Descriptive Note:

Corporate Author:

CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV

Personal Author(s):

Report Date:

1978-09-01

Pagination or Media Count:

84.0

Abstract:

The dam is considered to be in fair condition. The dam is believed to be safe under normal operating conditions. The test flood is the PMF. It is recommended that the owner engage the services of a qualified consultant to evaluate the stability of the dam. In addition to long term recommendations, there are several remedial measures which should be implemented. Author

Subject Categories:

  • Civil Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE