Accession Number:

ADA155371

Title:

National Program for Inspection of Non-Federal Dams. Lake Josephine Dam (ME 00345), Saint John River Basin, Easton, Maine. Phase I Inspection Report.

Descriptive Note:

Corporate Author:

CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV

Personal Author(s):

Report Date:

1981-09-01

Pagination or Media Count:

87.0

Abstract:

The earthfill structure is about 3500 ft. long, 31 ft. high, and 18 ft. wide. In addition to the main dam, this project has a dike and drainage ditch surrounding the reservoir. It is intermediate in size with a hazard potential of high. No urgent or emergency actions are required for the dam based on the inspection. Author.

Subject Categories:

  • Hydrology, Limnology and Potamology
  • Civil Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE