Accession Number:

ADA143436

Title:

Analysis of Base Civil Engineering General Purpose Vehicle Table of Allowances

Descriptive Note:

Student rept.

Corporate Author:

AIR COMMAND AND STAFF COLL MAXWELL AFB AL

Personal Author(s):

Report Date:

1984-03-01

Pagination or Media Count:

68.0

Abstract:

Presents an improved Basis of Issue BOI for determining the Base Civil Engineering General Purpose Vehicle Allowances based upon analysis of workload, production output, and manpower strength of 25 AF BCE units, utilizing coefficient of correlation and linear regression. The vehicle fleet sizes of 20 civilian businesses were compared. The recommended BOI, represented by the newly developed equation, Y.4 .5X better reflects BCE vehicle needs, Xshop man- power, Yshops vehicle allowance than the present BOI.

Subject Categories:

  • Civil Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE