Accession Number:

ADA129771

Title:

Lock & Dam 7 Mississippi River near La Crosse, Wisconsin. Reconnaissance Report for Hydropower.

Descriptive Note:

Preliminary rept.

Corporate Author:

CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT

Personal Author(s):

Report Date:

1980-12-01

Pagination or Media Count:

177.0

Abstract:

This report presents a preliminary evaluation of the addition of hydropower at the existing navigation Lock and Dam 7. The study shows that installation of a hydro plant with a 4,800-kW kilowatt or 7,200-kW nameplate rating is economical. Pertinent data concerning the site and two optional installations are given. Severe environmental impacts do not appear to be associated with construction of a plant of the sizes investigated despite the proximity of the lock and dam to an environmentally sensitive area. The District Engineer recommends that the Corps of Engineers prepare a feasibility report which can serve as a basis for congressional authorization for hydropower plant construction at Lock and Dam 7.

Subject Categories:

  • Electric Power Production and Distribution
  • Civil Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE