Accession Number:

ADA112080

Title:

Marine Corps Field Logistics System. Appendix A. Equipment Status

Descriptive Note:

Final rept.

Corporate Author:

NORTHROP SERVICES INC ARLINGTON VA

Personal Author(s):

Report Date:

1980-12-01

Pagination or Media Count:

117.0

Abstract:

To develop the Field Logistics System FLS Master Implementation Plan requires a review of the status of each FLS item and its associated FLS dependencies, an identification of the equipment it is to replace, and a determination of when replacement should occur. To accomplish this, the methodology employed was to Identify each item of the FLS Identify the existing equipment which will be replaced Determine the development status of each FLS item and its impact on total system implementation Determine the availability of each item for procurement Determine the quantity of FLS items required to effectively replace existing assets Project production unit costs Determine existing asset age, life cycle, and future useful life and Recommend the phase-out or disposal of existing assets and introduction of FLS items. This methodology formed the basis for the equipment data baseline used in development of the various plans required for system implementation. This report describes each of the FLS items and provides a detailed informational status of each element as collected to date.

Subject Categories:

  • Construction Equipment, Materials and Supplies
  • Surface Transportation and Equipment
  • Structural Engineering and Building Technology
  • Logistics, Military Facilities and Supplies

Distribution Statement:

APPROVED FOR PUBLIC RELEASE