Accession Number:

ADA106860

Title:

Questions Concerning DOE's Assignment of Operating and Testing Responsibilities for OTEC-1.

Descriptive Note:

Corporate Author:

GENERAL ACCOUNTING OFFICE WASHINGTON DC ENERGY AND MINERALS DIV

Personal Author(s):

Report Date:

1981-06-30

Pagination or Media Count:

12.0

Abstract:

OTEC is one of the potential energy sources being developed to provide alternatives for reducing the Nations dependence on imported oil. When developed, OTEC is to use the temperature variants of the ocean to produce electricity and energy intensive products. OTEC-1 is a major part of DOEs developmental program for OTEC. It is a floating test facility designed primarily for conducting sea tests of the cleanability and performance of heat exchangers, a major component of OTEC systems. Related OTEC subsystems are also being tested. OTEC-1 was to be accomplished in three phases design phase I construction phase II and operations and testing phase III. In July 1977, DOE contracted with TRW, Inc. to design and develop the heat exchanger to be used on OTEC-1. In September 1978, DOE contracted with Global Marine to refurbish, retrofit, and deploy an old Navy ship with OTEC subsystems including TRWs heat exchanger. Together Global Marine and TRW were the OTEC-1 design and construction contractors for phases I and II with Global Marine having overall responsibility for integrating its and TRWs work. Global Marines contract also included an option for performing work in phase III. Author

Subject Categories:

  • Non-electrical Energy Conversion
  • Air Conditioning, Heating, Lighting and Ventilating

Distribution Statement:

APPROVED FOR PUBLIC RELEASE