Title:
National Dam Safety Program. Moss Number 1 Fresh Water Supply Dam (Inventory Number VA 05103), Dickenson County, Virginia. Phase I Inspection Report.
Descriptive Note:
Final rept.,
Corporate Author:
SCHNABEL ENGINEERING ASSOCIATES RICHMOND VA
Report Date:
1979-09-01
Pagination or Media Count:
44.0
Abstract:
Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D. C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE