DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
ADA076220
Title:
Grouting Instrumentation, Old River Low Sill Control Structure.
Descriptive Note:
Final rept.,
Corporate Author:
ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG MS STRUCTURES LAB
Report Date:
1979-09-01
Pagination or Media Count:
20.0
Abstract:
Instrumentation was developed and used in the field to monitor the presence and flow of grout during remedial grouting of the Old River Low Sill Control Structure. Measurements were also made of uplift pressures by means of transducers installed in packers in drilled holes through the slab. This report presents information on the development and field use of instruments to detect the presence of grout, the rate of buildup under the base of the structure, and pressure increase under the slab due to grouting operations. All data were electronically recorded and were used extensively to regulate the grouting operation. Author
Distribution Statement:
APPROVED FOR PUBLIC RELEASE