Accession Number:

ADA052678

Title:

Quarterly Interim Technical Report (2nd), Contract DAAH01-75-C-0194.

Descriptive Note:

Rept. for 15 Jan-15 Apr 75.

Corporate Author:

B-K DYNAMICS INC ROCKVILLE MD

Personal Author(s):

Report Date:

1975-04-15

Pagination or Media Count:

80.0

Abstract:

BKDs interim STINGER simulation activities have been associated with readying the hardware for data transmission between the major system components i.e. SDS9300 to AD-4 and SDS9300 to GE3010. During the quarter, IRSS interface operation was intermittent. Extensive testing was done to discover the source of errors generated in data exchanges. Grounds, power supplies and other potential sources of noise were investigated. The problem was finally resolved by the replacement of several marginal gates, relocation of driverreceiver cards to the GE3010s CPU chassis, and modification of the ground system. In the course of the above activities, software was generated for use in checking the SDS9300 to GE3010 link and the SDS9300 to AD-4 link. Specifically, three programs were developed A general purpose AD-4 test routine, An AD-4 discrete test routine, and A GE3010 interface test routine.

Subject Categories:

  • Computer Programming and Software
  • Surface-Launched Guided Missiles

Distribution Statement:

APPROVED FOR PUBLIC RELEASE