Accession Number:
ADA052233
Title:
DD-Type Management Plan and Program Outlines for Use in PEB/LOE Preparation.
Descriptive Note:
Corporate Author:
ARINC RESEARCH CORP ANNAPOLIS MD
Personal Author(s):
Report Date:
1975-01-01
Pagination or Media Count:
150.0
Abstract:
This document contains information that will be helpful to ship personnel in preparing for the PEBLOEs. An LOE is conducted by the PEB before the first fire is lighted in a boiler in each fireroom during a regular overhaul ROH. The Board reviews administrative, training, and material readiness for the light-off of each propulsion plant. Actual light-off of the plant is not a part of the examination. This document is assembled into five basic sections, identified by tabs. Tab A, Management Plan, contains a milestone chart for PEBLOE preparation. Tab B, Management Plan Action Required Form, is provided as a check-off planning and monitoring document. Tabs C through E are entitled, respectively, Administrative Preparation, Training Preparation, and Material Preparation.
Subject Categories:
- Administration and Management
- Marine Engineering