Accession Number:

ADA052233

Title:

DD-Type Management Plan and Program Outlines for Use in PEB/LOE Preparation.

Descriptive Note:

Corporate Author:

ARINC RESEARCH CORP ANNAPOLIS MD

Personal Author(s):

Report Date:

1975-01-01

Pagination or Media Count:

150.0

Abstract:

This document contains information that will be helpful to ship personnel in preparing for the PEBLOEs. An LOE is conducted by the PEB before the first fire is lighted in a boiler in each fireroom during a regular overhaul ROH. The Board reviews administrative, training, and material readiness for the light-off of each propulsion plant. Actual light-off of the plant is not a part of the examination. This document is assembled into five basic sections, identified by tabs. Tab A, Management Plan, contains a milestone chart for PEBLOE preparation. Tab B, Management Plan Action Required Form, is provided as a check-off planning and monitoring document. Tabs C through E are entitled, respectively, Administrative Preparation, Training Preparation, and Material Preparation.

Subject Categories:

  • Administration and Management
  • Marine Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE