Accession Number:

ADA051877

Title:

Economic Analysis of Selected Test Measurement and Diagnostic Equipment from the U.S. Army Communications Command Preferred Items List.

Descriptive Note:

Final rept. on Phase 2,

Corporate Author:

ARINC RESEARCH CORP ANNAPOLIS MD

Personal Author(s):

Report Date:

1974-11-01

Pagination or Media Count:

53.0

Abstract:

This report presents the results of a two-month study for the U.S. Army Electronics Command USAECOM, Ft. Monmouth, New Jersey, and the U.S. Army Communications Command USACC, Ft. Huachuca, Arizona. The study represents the second phase of an anticipated five-phase program to evaluate the overall cost effectiveness of standardizing Test Measurement and Diagnostic Equipment TMDE of the USACC Preferred Items List PIL. The five proposed phases of the program are 1 Development of a TMDE life cycle cost LCC estimation methodology and selection of three PIL TMDE for detailed economic analysis 2 Determination of the availability of data required to conduct the economic analysis of the three selected TMDE 3 Conduct of the economic analysis of the selected TMDE 4 Development of a methodology for evaluating the economic impact of the complete PIL, based upon the results of Phases 1, 2, and 3 5 Evaluation of the economic impact of the complete PIL, using the methodology developed during Phase 4.

Subject Categories:

  • Test Facilities, Equipment and Methods
  • Logistics, Military Facilities and Supplies

Distribution Statement:

APPROVED FOR PUBLIC RELEASE