Accession Number:

ADA046510

Title:

Conceptual Design of a Basic Production Facility for the XM587E2/XM724 Electronic Time Fuzes

Descriptive Note:

Contractor rept.

Corporate Author:

HONEYWELL INC MINNETONKA MN DEFENSE SYSTEMS GROUP

Personal Author(s):

Report Date:

1977-11-01

Pagination or Media Count:

249.0

Abstract:

This report documents the efforts and accomplishments of the basic production facility program for the XM587E2XM724 electronic time fuzes. Phase I consisted of an engineering investigation of the conceptual design of two automated assembly lines. One of the automated assembly lines assembles, tests, and inspects either the XM587E2 electronic time fuze or the XM724 electronic time fuze and the other automated assembly line assembles, tests, and inspects the safing and arming S and A modules for these fuzes. Phase II consisted of writing specifications for the machinesstations for the automated assembly lines, conducting unit product cost UPC estimates, and analyzing the automated assembly line amortization time period. Phase II also included reliability - availability - maintainability RAM and hazard analyses. Author

Subject Categories:

  • Manufacturing and Industrial Engineering and Control of Production Systems
  • Ammunition and Explosives

Distribution Statement:

APPROVED FOR PUBLIC RELEASE