Accession Number:

ADA043055

Title:

Preliminary Design, Vertical Stores Handling Conveyor

Descriptive Note:

Final rept. on Phase 2

Corporate Author:

KORNYLAK CORP HAMILTON OH

Personal Author(s):

Report Date:

1977-05-01

Pagination or Media Count:

536.0

Abstract:

The primary purpose of Phase II of Research and Development Contract No. N00024-72-C-5500 was to prepare detailed preliminary design drawings based on the concepts developed and approved in Phase I. Phase II also required the preparation and submittal of a Final Reliability Program, a Final Maintainability Program, a Failure Modes and Effects Selection Criteria Report, a Final Failure Modes and Effects Analysis, detailed design calculations, various Engineering Studies and Investigations. Drawings, programs, plans, studies, investigations and reports have been completed and submitted fulfilling all requirements of Phase 2.

Subject Categories:

  • Construction Equipment, Materials and Supplies
  • Logistics, Military Facilities and Supplies

Distribution Statement:

APPROVED FOR PUBLIC RELEASE