Accession Number:

ADA036856

Title:

The Codorus Creek Wastewater Management Study. Appendix A. Technical Studies. Volume IV.

Descriptive Note:

Corporate Author:

CORPS OF ENGINEERS BALTIMORE MD BALTIMORE DISTRICT

Personal Author(s):

Report Date:

1972-08-01

Pagination or Media Count:

266.0

Abstract:

Analysis of wastewater management problems and solution opportunities in the Codorus Creek STudy program has led to the formulation and analysis of a broad range of technology and design choices for area selection. The alternatives formulated have encompassed 1 a range of specific solutions that have been generally advocated for the area 2 a range of basic technology choices for achieving the high level of advanced treatment deemed ultimately required 3 alternative levels of performance capability for initial improvements and 4 a broad range of institutional management choices and limitations. The alternatives formulation and technologic, policy and citizen review processes have led to the selection of a final group of choices for plan selection. This final group represents a refinement of initial alternatives with respect to technical feasibility, design basis, facility elements and project costs. This report presents each of these plans which constitute the finalized Alternatives for Choice applicable to the Codorus Creek Study Area.

Subject Categories:

  • Administration and Management
  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE