Accession Number:

ADA036794

Title:

Wastewater Engineering and Management Plan for Boston Harbor-Eastern Massachusetts Metropolitan Area EMMA Study. Technical Data Volume 2. Engineering Criteria.

Descriptive Note:

Corporate Author:

METCALF AND EDDY INC BOSTON MASS

Personal Author(s):

Report Date:

1975-10-01

Pagination or Media Count:

142.0

Abstract:

This report covers the engineering criteria used in the project including the bases of estimating wastewater flows, sewerage needs, and costs. Projections of sewerage needs and wastewater flows are made for each community. Several communities, however, have been broken down into smaller subdivisions in order to more accurately represent their effect on the MDC sewerage system. These are Brookline, Milton, Newton, and Boston.

Subject Categories:

  • Administration and Management
  • Water Pollution and Control

Distribution Statement:

APPROVED FOR PUBLIC RELEASE