Accession Number:
ADA026906
Title:
Production Engineering Measure for Polysulfone Capacitors for Short Intrusion Proximity Fuze.
Descriptive Note:
Quarterly rept. no. 7, 24 Nov 75-24 Feb 76,
Corporate Author:
GUDEMAN CORP CHICAGO ILL
Report Date:
1976-03-22
Pagination or Media Count:
43.0
Abstract:
First Test Article Report and Gun Shock Test Samples were approved by Harry Diamond Laboratories. Authorization was granted by ECOM to proceed with the pilot run phase of the contract. The Pilot Line Production Rate on the three polysulfone capacitors of the contract was witnessed by a USAECOM engineer and found to be acceptable. Pilot run units were fabricated and approved for life test and acceptance testing. Author
Distribution Statement:
APPROVED FOR PUBLIC RELEASE