Abstract:

A risk analysis of the schedule and cost associated with the development of the Army 155mm CLGP was performed. The time frame considered for this analysis is Begin Engineering Development in July 1975 to Multi-Year Buy. This analysis is an extension of one performed in Dec 74 and is in preparation for an ASARCDsarc 3. The VERT risk analysis technique was employed to perform the analysis.