Accession Number:

ADA011225

Title:

Results of RFI Testing of Safeguard Flexible Tunnel Section

Descriptive Note:

Final rept.

Corporate Author:

CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL

Report Date:

1975-05-01

Pagination or Media Count:

25.0

Abstract:

The report discusses results of the RFI shielding-effectiveness testing of a portion of the flexible tunnel section used for joining the equipment tunnels to the linear plate of the SAFEGUARD shielded enclosures. Test results are presented for several modifications to the tunnel section, including the mounting configuration to be used on site. These results indicate that, for most configurations, the shielding effectiveness of the tunnel section does meet the SAFEGUARD EMP specifications. Thus, the choise of configuration and material can be selected for construction convenience.

Subject Categories:

  • Electrical and Electronic Equipment
  • Antimissile Defense Systems

Distribution Statement:

APPROVED FOR PUBLIC RELEASE