Accession Number:
ADA010346
Title:
Little Goose Dam, Snake River, Washington, Hydraulic Model Investigation.
Descriptive Note:
Final rept. Oct 61-Dec 67,
Corporate Author:
ARMY ENGINEER DIV NORTH PACIFIC BONNEVILLE OREG DIV HYDRAULIC LAB
Report Date:
1975-04-01
Pagination or Media Count:
179.0
Abstract:
A 1100-scale hydraulic model was used to study the alignment of structures, excavation requirements, and flow conditions at Little Goose Dam. Tests of first-step construction led to relocation of the temporary fishway, use of rockfill groins along the north shore, selection of limits for disposal fills, and reductions of excavation, number of cofferdam cells, and height of embankments. The tests indicated that flow conditions during the first phase of second-step construction would be acceptable and that excavation planned for the second phase could be reduced.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE