Accession Number:

ADA009409

Title:

General Functional Systems Requirement for a Numerical Control Management Information System.

Descriptive Note:

Final rept.,

Corporate Author:

ARMY MATERIEL COMMAND TEXARKANA TEX INTERN TRAINING CENTER

Personal Author(s):

Report Date:

1975-03-01

Pagination or Media Count:

122.0

Abstract:

This report contains the General Functional Systems Requirement GFSR for a Management Information System for 40 Numerical Control Machines located at Rock Island Arsenal, Rock Island, Illinois. The GFSR is accomplished in the Systems Planning And Definition Phase of an Army Management System Life Cycle. Basically, the GFSR is a system definition that conceptually establishes requirements of the system in accordance with AR 18-1, tailored to the needs of management to whom the system will benefit. The advent of a Pilot Automated Shop Loading and Control System at Rock Island has created a need for a means of determining the efficiency of the numerical control machines with respect to the production operations there. This report establishes the criteria necessary to fulfill this need.

Subject Categories:

  • Administration and Management
  • Manufacturing and Industrial Engineering and Control of Production Systems

Distribution Statement:

APPROVED FOR PUBLIC RELEASE