Accession Number:

AD1035244

Title:

Test Operations Procedure (TOP) 06-2-301 Wind Testing

Descriptive Note:

Technical Report,01 Oct 2015,14 Jun 2017

Corporate Author:

U.S. Army Redstone Test Center Redstone Arsenal United States

Personal Author(s):

Report Date:

2017-06-14

Pagination or Media Count:

19.0

Abstract:

This Test Operations Procedure TOP provides guidance on how to perform wind testing. These procedures provide a general basis for testing and should be tailored to the specific test requirements and wind testing facility capabilities. When testing large structures, such as towers, the structural analysis team should be an integral part of the test team for specifying data requirements and supporting structural model validation and verification.

Subject Categories:

  • Test Facilities, Equipment and Methods

Distribution Statement:

APPROVED FOR PUBLIC RELEASE