Accession Number:

AD1017787

Title:

2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 9, Tracks 9-11

Descriptive Note:

Conference Proceedings

Corporate Author:

NATIONAL DEFENSE INDUSTRIAL ASSOCIATION ARLINGTON VA ARLINGTON United States

Report Date:

2005-08-04

Pagination or Media Count:

660.0

Abstract:

Track 9 Fern Ridge Dam, Oregon Seepage and Piping Concerns Internal Erosion Track 10 Marmet Lock and Dam Automated Instrumentation Assessment, SummerFall 2004, by Jeff Rakes and Ron Adams Success Dam Seismic Remediation Track 11 Canton Dam Spillway Stability Is a Test Anchor Program Necessary, by Randy Mead Dynamic Testing and Numerical Correlation Studies for Folsom Dam, by Ziyad Duron, Enrique E. Matheu, Vincent P. Chiarito, Michael K. Sharp and Rick L.Poeppelman Status of Portfolio Risk Assessment, by Eric Halpin Mississinewa Dam Foundation Rehabilitation, by Jeff Schaefer Wolf Creek Dam Seepage Major Rehabilitation Evaluation, by Michael F. Zoccola Bluestone Dam DSA Anchor Challenges, by Michael McCray Clearwater Dam Major Rehab Project, by Bobby Van Cleave Design, Construction and Seepage at Prado Dam, by Douglas E. Chitwood Seven Oaks Dam Outlet Tunnel Invert Damage, by Robert Kwan An Overview of An Overview of the Dam Safety Program Management Tools DSPMT, by Tommy Schmidt

Subject Categories:

  • Civil Engineering
  • Structural Engineering and Building Technology

Distribution Statement:

APPROVED FOR PUBLIC RELEASE