Abstract:
The circuit patching facilities presently fielded are not adequate to perform all the functions required at area and large command signal centers. These patching facilities lack necessary four-wire interconnection capacity, line test and monitor facilities, and adequate space and facilities for operating personnel. The Communication Technical Control Center ANTSQ-84 is being developed to fulfill this need and replace the outdated Communications Patching Panel SB-675AMSC. The ANTSQ-84 will be fielded as a one-for-one replacement of the SB-675AMSC to signal units that receive the Army Tactical Area Communications System ATACS High Capacity System equipment.
Distribution Statement: