DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0909420
Title:
Results of Product Inspection of Titanium Samples Using P5F-2.5 Penetrant,
Descriptive Note:
Corporate Author:
NORTH AMERICAN ROCKWELL CORP LOS ANGELES CA LOS ANGELES DIV
Report Date:
1972-08-16
Pagination or Media Count:
23.0
Abstract:
If B-1 structure is designed to tolerate an initial flaw size smaller than 0.150 inch,. it is required that the flaws be detected to a 90 percent probability and 95 percent confidence level. The results of the 61 observations of flaws in the range of 0.025 to 0.050 inch length with two misses verifies to a 90 percent probability the P5F-2.5 penetrant system will find flaws in this range to a 95 percent confidence level. The P5F-2.5 penetrant system is capable of reliability detecting flaws 0.015 inch or greater using selected inspection personnel.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE