DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0857137
Title:
Operation and Service Manual for ECS Primary O2 System High Pressure Leak Rate Tester 52E180193.
Descriptive Note:
Space technical data rept.
Corporate Author:
MCDONNELL DOUGLAS ASTRONAUTICS CO ST LOUIS MO
Report Date:
1968-12-20
Pagination or Media Count:
21.0
Abstract:
The purpose of the report is to familiarize personnel with the operation and service instructions for the Environmental Control System ECS Primary O2 System High Pressure Leak Rate Tester. The tester consists of two carrying cases and is used to determine spacecraft ECS leakages. The report presents a description of the tester, its control and indicator functions, and service instructions for preventive maintenance. Author
Distribution Statement:
APPROVED FOR PUBLIC RELEASE