DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0852231
Title:
Factory Acceptance Testing of Missile 27F.
Descriptive Note:
Corporate Author:
GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA
Report Date:
1961-10-31
Pagination or Media Count:
33.0
Abstract:
Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system Electrical system Flight control system Inertial guidance system Propellant utilization system and Propulsion system. Author
Distribution Statement:
APPROVED FOR PUBLIC RELEASE