PRE-PRODUCTION TEST REPORT FOR SIGNAL CONDITIONER AND POWER CONTROL UNIT, MISSILEBORNE, IOC DWG. NO. 27-11008-807, SPEC. NO. 27-01201-E,

Descriptive Note:

Corporate Author:

GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA

Personal Author(s):

Report Date:

1960-11-05

Pagination or Media Count:

148.0

Abstract:

The purpose of the report is to describe the test equipment and environmental test procedure required for the pre-production testing of the missileborne signal conditioner and power control unit. Author