Accession Number:

AD0829626

Title:

PRELIMINARY OPERATING AND MAINTENANCE INSTRUCTIONS FOR THE RETARDING ROCKET INSTALLATION,

Descriptive Note:

Corporate Author:

GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA

Personal Author(s):

Report Date:

1957-02-15

Pagination or Media Count:

5.0

Abstract:

This manual provides operating and maintenance instructions for the retarding rocket installation on missiles having a removable nose cone. The purpose of the retarding rocket installation is to retard the missile afterbody, thus separating it sufficiently from the nose cone to prevent the afterbody interfering with the nose cone if it should start to tumble or to break up on reentry. Author

Subject Categories:

  • Surface-Launched Guided Missiles
  • Solid Propellant Rocket Engines

Distribution Statement:

APPROVED FOR PUBLIC RELEASE