Accession Number:

AD0829104

Title:

FACTORY ACCEPTANCE TESTING OF MISSILE 130D.

Descriptive Note:

Corporate Author:

GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA

Personal Author(s):

Report Date:

1963-03-15

Pagination or Media Count:

88.0

Abstract:

This report presents the results of composite tests, Project Mercury, conducted 7 March 1963, and subsequent post-composite testing. Pertinent systems level testing is also included. Final acceptance of Missile 130D was based on successful performance of all missile systems in accordance with Missile Composite Checkout Procedure, and Missile Factory Acceptance Test Plan and Test Evaluation. Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. Author

Subject Categories:

  • Surface-Launched Guided Missiles

Distribution Statement:

APPROVED FOR PUBLIC RELEASE