A Data-Based Methodology for Specifying Construction Project Durations.
Descriptive Note:
Technical rept.,
Corporate Author:
ARMY CONSTRUCTION ENGINEERING RESEARCH LAB CHAMPAIGN ILL
Personal Author(s):
Report Date:
1973-08-01
Pagination or Media Count:
24.0
Abstract:
The report presents a method of determining the construction contract performance times for military construction projects. This method is based on information that is regularly reported as feedback during the execution of a construction contract for military construction, Army projects. By organizing the data from the manpower-utilization feedback reports, a model is formulated and mathematically derived. An example of data reduction is presented, and the results of applying the methodology to these projects are reported. A proposal of implementation of the methodology in U.S. Army Corps of Engineers district offices is presented. Author
Descriptors:
Subject Categories:
- Administration and Management
- Civil Engineering
- Logistics, Military Facilities and Supplies