Accession Number:

AD0757408

Title:

A Laboratory Development of Cavitation-Free Baffle Piers Bluestone Dam, New River, West Virginia.

Descriptive Note:

Corporate Author:

ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG MISS

Personal Author(s):

Report Date:

1948-03-01

Pagination or Media Count:

96.0

Abstract:

Model studies of the stilling basin for Bluestone Dam, New River, West Virginia, were conducted at the Waterways Experiment Station in 1941-42 for the Huntington District, CE. The general purpose of the studies was to investigate the possibility and probable extent of destructive cavitation action on the Bluestone stilling-basin elements of original design, with the spillway in operation. It was also desired, if possible, to develop means of correcting any unsafe or undesirable conditions found to exist in the stilling basin as designed.

Subject Categories:

  • Civil Engineering

Distribution Statement:

APPROVED FOR PUBLIC RELEASE