Accession Number:
AD0748918
Title:
Contract End Item Detail Specification (Prime Equipment). Part I. Performance/Design and Qualification Requirements. Test Position, Purge, Fill, and Leak.
Descriptive Note:
Corporate Author:
HUGHES AIRCRAFT CO CANOGA PARK CALIF
Personal Author(s):
Report Date:
1972-08-24
Pagination or Media Count:
16.0
Abstract:
The specification established the requirements for performance, design, test, and qualification of one model of equipment, identified as purge, fill, and leak test position. This CEI provides for depot level testing of the MAVERICK guidance units. Author
Descriptors:
Subject Categories:
- Test Facilities, Equipment and Methods
- Air- and Space-Launched Guided Missiles