Accession Number:

AD0738845

Title:

POL Support Equipment

Descriptive Note:

Final rept. on test operations procedure

Corporate Author:

ARMY TEST AND EVALUATION COMMAND ABERDEEN PROVING GROUND MD

Personal Author(s):

Report Date:

1972-01-14

Pagination or Media Count:

12.0

Abstract:

The report describes a method for evaluation of POL support equipment operational and functional performance characteristics. Identifies supporting test, facilities, and equipment required. Provides procedures for batch interface detection, fuel contamination level, switching manifold, strainer, and trap tests. Applicable to hoselines, pipelines, pressure regulators, switching manifolds, monitoring devices, batch detectors, fuel testers, filters, separators, strainers and traps.

Subject Categories:

  • Pumps, Filters, Pipes, Tubing, Fittings and Valves
  • Test Facilities, Equipment and Methods

Distribution Statement:

APPROVED FOR PUBLIC RELEASE