Accession Number:

AD0736848

Title:

Production Lead Time Forecasting

Descriptive Note:

Final rept.

Corporate Author:

ARMY LOGISTICS MANAGEMENT CENTER FORT LEE VA

Personal Author(s):

Report Date:

1972-01-01

Pagination or Media Count:

41.0

Abstract:

The report describes a study of estimation procedures for the production lead time required in procurement of secondary items. The accuracy of production lead time forecasting is particularly important in the computation of variable safety levels. The study covers analysis of the performance of the present method for estimating lead times and an attempt to formulate improved methodology based on relationships existing between lead times and variables readily available to the item manager. It was found that the present methodology results in considerable forecast error. Stepwise regression was then used to develop modifications to the present methodology that gave better forecasts, but significant forecast error remains.

Subject Categories:

  • Logistics, Military Facilities and Supplies

Distribution Statement:

APPROVED FOR PUBLIC RELEASE