Accession Number:

AD0733876

Title:

Operation Flint Lock, Shot Pile Driver, Project Officer's Report--Project 3.5; Grouting and Materials Control.

Descriptive Note:

Final rept. Sep 63-Jul 66,

Corporate Author:

ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG MISS

Report Date:

1969-03-14

Pagination or Media Count:

244.0

Abstract:

The report describes laboratory tests and field support provided by U. S. Army Engineer Waterways Experiment Station for Project 3.5, Grouting and Materials Control. Part II of the report deals with all of the portland-cement-based backpacking used in the Pile Driver program. Part III presents an evaluation of the rock cores drilled from the Pile Driver site. Part IV concerns the grouting support for the Pile Driver program. Author

Subject Categories:

  • Laminates and Composite Materials

Distribution Statement:

APPROVED FOR PUBLIC RELEASE