Accession Number:
AD0730758
Title:
Engineering Change Proposals,
Descriptive Note:
Corporate Author:
ARMY MISSILE COMMAND REDSTONE ARSENAL ALA COST ANALYSIS DIV
Personal Author(s):
Report Date:
1971-05-01
Pagination or Media Count:
18.0
Abstract:
Engineering changes are alterations to the established configuration identification. The number of changes will be dependent upon such factors as readiness of the system for production and technological changes. Definitions for cost areas requiring consideration in determining the total cost of an engineering change proposal have been established. Author
Descriptors:
Subject Categories:
- Administration and Management
- Guided Missiles