Accession Number:
AD0726323
Title:
Environmental Radiation Monitoring Plan for SM-1A Nuclear Power Plant, Fort Greely, Alaska
Descriptive Note:
Corporate Author:
ARMY ENGINEER REACTORS GROUP FORT BELVOIR VA ENGINEERING DIV
Personal Author(s):
Report Date:
1971-05-20
Pagination or Media Count:
25.0
Abstract:
The purpose of an environmental monitoring program is to assure that the waste control procedures utilized by a reactor plant are effective in preserving the integrity of the surrounding environment. The SM-1A Environmental Radiation Monitoring Plan provides a systematic method of sample collection, processing, and counting to assure standardized data in sufficient quantity to permit reliable statistical analysis. Periodic reports are prepared summarizing and interpreting the results.
Descriptors:
Subject Categories:
- Radioactivity, Radioactive Wastes and Fission Products
- Air Pollution and Control
- Water Pollution and Control
- Radiation Pollution and Control